Machines that are safe, compliant and reliably automated
Master craftsman business in mechatronics from Neusiedl am See: machine safety under the Machinery Regulation, PLC programming, retrofit and control panel building. For companies in Burgenland, Vienna, Lower Austria and throughout Austria.
Request the checkSomething else? All services
How the Machinery Regulation Check works
-
15-minute call
You describe the machine and the modification, I prepare the visit.
-
Half a day on site
I check guards and protective devices, safety functions and documents.
-
Report within 5 working days
With a traffic light rating per item and measures by priority.
Six services, one point of contact
-
Machine safety & CE
Risk assessment, PL verification, declaration of conformity.
-
PLC & safety PLC
Siemens TIA Portal, on site or remote.
-
Retrofit
Replacing old controllers safely.
-
Control panel building
Design and build to EN 60204-1.
-
Service & remote maintenance
Fixing faults via remote access or on site.
-
For engineering firms
Capacity for risk assessment and PLC.

My master craftsman project: test station for filling valves
The station tests filling valves for leaks, opening behaviour and flow. Mechanical design, control panel, S7-1500 program and CE documentation are all my own work.
View the project
Your contact: Jan Stephan
Master craftsman in mechatronics, master examination 2025 with distinction. With me you talk to the person who also works on your machine.
More about meFrequently asked questions
Does this also apply to old machines?
Not retroactively. Machines placed on the market under the Machinery Directive before 20 January 2027 may continue to be made available and operated. For operation in Austria, the Employee Protection Act (ASchG) and the Work Equipment Ordinance (AM-VO) continue to apply. If such a machine is substantially modified afterwards, the manufacturer obligations of the new regulation apply to it.
When does a modification become a substantial modification?
What matters is whether the modification creates a new hazard or increases a risk. It is a substantial modification if this makes new protective devices necessary that require a change to the safety control system. The same applies to additional measures for stability or mechanical strength. A further condition is that the manufacturer had not foreseen the change.
What does the check cost?
From €890 net per machine plus VAT, for half a day on site and the report. If your machine needs more time, I tell you before any extra work is done. If an order follows, the check is credited.
Planning a modification? Check first, then modify.
In a 15-minute call we clarify whether a check makes sense for your machine.
Request the checkPrefer to call? +43 660 800 7100
